Insight
LMI and crane electronics sit in a gap between general mechanics and OEM networks. Here's what to look for in a repairer.
Kingy's Diesel Industries
August 3, 2026
4 min read

A Load Moment Indicator keeps a crane operating within its load chart. Get the repair or calibration wrong and the machine is either unsafe or unusable. It needs manufacturer training, the right software and the diagnostic kit — not trial-and-error part swapping.
General diesel mechanics often don't have the training or software; OEM networks won't touch a competitor's brand. That leaves mixed-fleet operators stuck.
Manufacturer training such as Liebherr Liccon 1 and 2, authorised repairer status for systems like Robway, on-site calibration capability, and the ability to return the machine within manufacturer specification — with documentation for your compliance file.
A power station's 50-tonne crane was shutting down unexpectedly from a faulty LMI. Diagnosed, repaired and calibrated on site, it was back within manufacturer spec — and the client said so.
Sunshine Coast · Brisbane · Gold Coast · Bundaberg · Gladstone · Mackay
Plus remote, interstate and international mobilisation.
We'll scope it, quote it fixed, and give you a date we'll stand behind.
Backed by our Zero Downtime Guarantee.