24/7 Breakdown · (07) 5446 7396
October bookings now open — limited slots
Capability Statement

Case study

Winning a Council Tender — Twice — on an EWP Basket Refurbishment

Winning a Council Tender — Twice — on an EWP Basket Refurbishment

Selected through a competitive tender — for the second time — to refurbish an EWP basket attachment to full structural integrity and safety compliance.

The challenge

A council EWP basket attachment needed major inspection and refurbishment, procured through a competitive tender process.

The scope

Major inspection and refurbishment, including rewiring for remote operation and structural restoration.

What we found

Rusted cross-bracing and structural items identified through comprehensive NDT crack testing.

The work

Rewired the basket for remote control from the platform; removed all rusted cross-bracing after NDT crack testing with AMAP Engineering; restored full structural integrity; sandblasted, painted and stickered to all relevant safety standards.

The result

  • Basket restored to full structural integrity
  • Compliant with relevant Australian standards
  • Selected via competitive tender for the second time
Locations

Based on the Sunshine Coast.
On site across Australia.

Sunshine Coast · Brisbane · Gold Coast · Bundaberg · Gladstone · Mackay
Plus remote, interstate and international mobilisation.

We're ready when you are.

We'll scope it, quote it fixed, and give you a date we'll stand behind.
Backed by our Zero Downtime Guarantee.

Call 24/7Book a Service